The objective of this report was to summarize results of a five-year study conducted on the Red Deer River to assess the effects of impounding the river behind Dickson Dam. It also presents results of a study on Gleniffer Lake, the reservoir created when the dam was constructed in 1983.
Dickson Dam, Gleniffer Lake, Red Deer River, zoobenthos, water quality
| Orig. pub. date: | 1994-04-25 |
| Catalogue #: | ENV-706-O |
| Author: | R.D. Shaw and A.M. Anderson |
| Type: | Report |
| Formats: |
|
| Size: | 6.83 Mb |
| Coverage: | Alberta |
| Language: | English |
| Article Cost: | 0.00 |